Commit Graph

2 Commits

Author SHA1 Message Date
will 2d442f9958 CI: bump deploy workflow's Node to 26, matching jsdom 30's engine requirement
Deploy / deploy (push) Failing after 38s
jsdom 30 dropped support for Node 20 (needs ^22.22.2 || ^24.15.0 || >=26.0.0).
The CI workflow was still pinned to Node 20 from before that dependency bump,
so `npm test` failed in every run since — tests passed locally (on Node 26)
but the pipeline never got past the Test step, so neither of the last two
pushes actually deployed. The Dockerfile's own build stage doesn't need the
same bump: it only runs `npm run build` (tsc + vite), which doesn't touch
jsdom.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-09 20:14:32 -04:00
will a5dc6502d7 Milestone 0/1: shell, calendar/psalter/hours scaffold, Prime
Deploy / deploy (push) Failing after 1m8s
Client-side-first PWA (Vite/TS, no backend) per the approved plan: day-
navigable shell listing all 8 hours, Prime fully resolves via the
calendar -> psalter -> ordo pipeline, the other 7 hours are registered
but flagged not-implemented. Sanctoral/temporal calendar data uses a
day -> id indirection layer (saints, easter-offsets, fixed-date-calendar)
so reassigning a feast to a different day is a data edit, not a code
change. Docker (Caddy-serving-static) + Gitea CI workflow scaffolded to
match the eec/drip/bookshop operational pattern.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-09 15:20:06 -04:00